UK Commercial Cost Calculator
Office Fit-Out Cost Calculator
Estimate a UK office or commercial fit-out cost range from floor area, project grade and location. Use the result as an early feasibility allowance before obtaining a measured professional cost plan.
Your project
Estimate
Illustrative September 2026 UK cost bands for early planning only. Scope, specification, existing services, fees and VAT can materially change the final cost.
How to budget for commercial fit-out
Commercial fit-out budgets move from a bare shell through landlord-ready Category A to occupier-specific Category B space. Floor area establishes scale, while grade and location provide a useful early cost band before design and surveys are complete.
Use the calculator for a quantity-led starting point, then check it against the chosen manufacturer's technical information and a supplier quote. Product dimensions, coverage and pack sizes change, and a low advertised unit rate can be offset by delivery, minimum orders or accessories. Keep the measurements, quantity calculation and cost assumptions together so they can be updated without remeasuring the project.
Typical UK commercial fit-out prices
The figures below are illustrative UK ranges as at September 2026, including VAT where normally charged. Supply-only means the main named material and does not automatically include preparation, delivery, accessories or waste. Supplied-and-fitted ranges are broad consumer budgeting figures, not quotations; London, difficult access and unusually small jobs can cost more.
| Material or service | Typical supply-only | Typical supplied and fitted |
|---|---|---|
| Shell and core completion | £350–£650 | £450–£850 |
| Category A fit-out | £650–£1,050 | £750–£1,250 |
| Category B fit-out | £1,100–£2,000 | £1,250–£2,400 |
| Office furniture | £180–£600 per workstation | £250–£850 per workstation |
| Professional fees | 8–15% of works | 10–20% of works |
Prices are shown per m² as appropriate. Compare like with like: clarify VAT, delivery, removal of old material, preparation, finishing and guarantees. A contractor rate may include several of these, while a retailer's headline price generally does not. Obtain current local prices before ordering or agreeing work.
Worked example: calculation step by step
Consider a 420m² office in the South East requiring a Category B fit-out. The calculator uses an illustrative UK base band of £1,100–£2,000 per m² and applies the South East location factor of 1.08.
Low estimate: 420 × £1,100 × 1.08 = £498,960. High estimate: 420 × £2,000 × 1.08 = £907,200. The midpoint is (£498,960 + £907,200) ÷ 2 = £703,080, equivalent to £1,674 per m².
This early works range should be reconciled with the brief. If design and consultant fees are assumed at 12% of the midpoint, add £84,370. A 7.5% project contingency adds another £52,731, creating a preliminary midpoint funding allowance of about £840,181 before VAT, loose IT equipment, relocation and landlord contributions.
What drives the cost?
- Fit-out grade and quality specification. Ask whether this is included in a price and what assumption has been made. A change here can affect material quantity, labour time and the supporting work, so it deserves its own budget line rather than being hidden in a general contingency.
- Mechanical, electrical and fire-service changes. Ask whether this is included in a price and what assumption has been made. A change here can affect material quantity, labour time and the supporting work, so it deserves its own budget line rather than being hidden in a general contingency.
- Meeting rooms, acoustics, kitchens and bespoke joinery. Ask whether this is included in a price and what assumption has been made. A change here can affect material quantity, labour time and the supporting work, so it deserves its own budget line rather than being hidden in a general contingency.
- Furniture, AV, data and security scope. Ask whether this is included in a price and what assumption has been made. A change here can affect material quantity, labour time and the supporting work, so it deserves its own budget line rather than being hidden in a general contingency.
- Location, working restrictions and programme. Ask whether this is included in a price and what assumption has been made. A change here can affect material quantity, labour time and the supporting work, so it deserves its own budget line rather than being hidden in a general contingency.
Project scale also changes the unit cost. A contractor still has travel, setup and administration on a small job, while larger orders may attract delivery efficiencies. Geography matters too: labour and parking are commonly higher in London and parts of the South East, while remote deliveries can carry their own premium. Seasonal demand may change lead times even where the quoted rate is stable.
Wastage allowance
Physical waste varies by trade rather than one universal rate. Early budgets commonly allow about 5% on standard materials, rising to 10% for bespoke finishes or uncertain existing conditions. In addition, hold a design and construction contingency—often 5–10% at an early stage—which covers scope development and discoveries rather than offcuts.
Apply waste to quantity before rounding to whole packs, boards, bags or rolls. Rounding first and then adding a percentage can either overbuy or leave an unusable fraction. If unopened stock is returnable, check the return window and batch restrictions. Do not assume every surplus item can be returned: special orders, mixed products and cut lengths are commonly excluded.
Measure and plan before buying
Draw the area and label every dimension instead of relying on one length and width from memory. Split L-shaped or stepped spaces into rectangles, calculate each one, and add the results. Measure in the same unit throughout. Recheck the narrowest access, floor levels, corners and fixed obstacles because these can determine product size, installation sequence or whether specialist equipment is needed.
Read the technical sheet before substituting one product for another. Two items sold for the same purpose may have different coverage, fitting centres, thicknesses or base requirements. Check compatibility between the main material and its fixings, adhesive, membrane or substrate. Manufacturer instructions normally take priority over a general calculator and may be required to preserve a warranty.
DIY budget versus a fitted quote
A DIY total should include consumables, personal protective equipment, tool hire, delivery and disposal, not only the finish material. It is sensible to keep a separate contingency of around 5–10% of the complete budget for discoveries and price movement. That contingency is different from material waste: wastage buys enough physical product, while contingency protects the cash budget.
For professional work, seek an itemised written quote. It should identify preparation, material specification, quantity, waste ownership, access assumptions, protection, cleanup, disposal, VAT, payment stages and guarantee. Ask what would count as a variation. Comparing itemised scopes is more reliable than choosing the lowest total where important work may be omitted.
Using this estimate responsibly
The result is a planning estimate, not a structural design or site survey. Hidden defects, moisture, unsuitable ground and regulated work cannot be diagnosed from dimensions alone. Confirm structural, fire, electrical, ventilation and planning requirements with a suitably competent person where they apply. Stop and investigate if the existing surface is damp, unstable or contaminated.
Save the exact product details used in the calculation, including pack coverage and unit price. When a quote or retailer price changes, update that input rather than altering the measured area. This makes the estimate auditable and helps distinguish a genuine price change from a quantity error.
Frequently asked questions
What is the difference between Category A and Category B?
Category A creates a functional blank office with core services and finishes. Category B adapts it for an occupier with rooms, furniture, branding, AV and specialist requirements.
What does shell and core mean?
It is the basic building envelope and central common services, before a tenant-ready internal specification is installed. Exact landlord definitions vary.
How much does an office fit-out cost per square metre?
Illustrative September 2026 UK bands range from roughly £650–£1,050 per m² for Category A and £1,100–£2,000 for Category B before location adjustment.
Does the estimate include VAT?
The calculator presents an indicative construction budget and does not add VAT separately. Confirm VAT treatment, professional fees and recoverability with advisers.
Are furniture and IT included?
Treat them as separate unless your chosen cost band or contractor scope expressly includes them. Category B packages vary greatly in furniture, AV and technology.
How long does a commercial fit-out take?
A modest office may take several weeks on site, while design, approvals, procurement and complex services can make the overall programme several months.
Related calculators
Paint Cost
Work out litres and total spend for any room, by coats and brand coverage.
Fence & Shed Paint
Estimate fence or shed paint by panel count or total length.
Masonry Paint
How much exterior masonry paint your walls need, plus cost.
Wallpaper
Rolls needed with pattern repeat, plus total wallpaper cost.